SB9 will unleash the sub-division as well though baby steps

Authors
tailwind-nextjs-banner

SB9 will unleash the sub-division as well though baby steps

Construction in California especially building a single family home usually take 20-30 months from planning, design, hearing, construction review, detail design and engineering, to construction and final.

Suburban life style of California established neighborhood usually requires 6000sf -8000sf per the zoning code while a new townhouse or apartment average lot is around 1000sf or smaller.

To reach a compromise of to preserves the communities heritage, homeowner ownership with increased housing capacity, SB9 opens a legal pathway to jump start and fast track for a ADU addition and subdivision. Different from the long 3-5 years long, costly subdivision process before the construction, the beauty of subdivision under SB9 wins not only fast tracked, clearly guided, result assured, but also the design and planning of subdivision and building are submit together. Once permitted, construction and subdivison can start the same time.

Success stories:

A 3.25 arce premium land in Los Altos Hill, CA area in 2 acre zone was not able to subdivide, a plan of subdivsion into 2 lots: 1 acre lot plus 2.25 acre lot with 2 main houses and 2 ADUs are in the progress.